Solar Plus Storage for EPC Companies: Zero Export, Backup and How to Win More C&I Projects

How solar EPC companies in India can add battery storage to win more C&I projects: zero-export, curtailment, backup, sizing, installation and support.

Adding battery storage to a solar proposal lets an EPC company answer the questions that currently cost it projects: what if the customer cannot export, what about the evening peak tariff, what about backup, and what about diesel. A solar plant alone generates only in daylight; solar plus storage turns that energy into something the customer can use when they need it.

Where solar-only proposals lose

Customer concernWhy solar alone falls shortHow storage helps
DISCOM caps or blocks exportThe array is sized down to the daytime load, or output is cutSurplus charges the battery instead of being curtailed
Highest tariff is in the eveningSolar output is near zero after sunsetBattery discharges into the peak slot
Outages disrupt operationsA grid-tied solar inverter shuts down when the grid failsA BESS with backup capability keeps critical loads on
High diesel generator running costSolar cannot run during an outageBattery covers short outages and reduces generator hours
Tariff includes demand chargesSolar may not reduce short evening or cloudy-day peaksBattery can cover peaks

Zero-export and export-limited sites

Many rooftop and ground-mounted C&I plants must keep export at zero, or under a cap, as a condition of the DISCOM approval. Without storage, the plant either shrinks or the inverter throttles on sunny days. With storage, the controller sends surplus to the battery and releases it later. The result is that you can quote the full array size the roof or land supports instead of cutting it to the minimum load.

In the day, solar supplies the site's loads and the surplus charges the battery, so nothing is exported at the meter. In the evening, the battery supplies the loads.DaySolarLoadsBatterychargesMeterexport: 0EveningBatterydischargesLoadsSolar≈ 0The full array can be built: surplus is stored, not curtailed,and export stays within the DISCOM's approval

This requires a proper zero-export control scheme: metering at the point of common coupling, fast control between the PV inverter and the battery, and settings that match the DISCOM's approval conditions.

Which system to use: AC-coupled or hybrid?

  • Existing solar plant: add an AC-coupled battery cabinet, such as the TCL BlueArk W10 (125 kW / 261 kWh).
  • New solar plus storage project: consider a hybrid, DC-coupled cabinet such as the TCL BlueArk X5, which combines a 50 kW PCS, a 100 kWh LFP battery and a PV inverter for up to 100 kWp in one cabinet. Up to ten cabinets can be paralleled for 500 kW / 1 MWh.

Read the full comparison in DC-coupled vs AC-coupled vs hybrid BESS.

Backup and generator integration

For customers who want to reduce diesel use, look for a system with a fast transfer, grid-forming ability and a generator input. The X5 datasheet, for instance, lists on/off-grid switching within 20 ms, black start without grid or sun, and a generator input of up to 138 kW. Backup design needs a critical-load list, correct neutral and earthing, surge protection on the backup output and a 4-pole transfer switch where the manufacturer specifies it.

Sizing a solar plus storage system

  • Start with the customer's goal: zero-export, evening peak, backup or a mix.
  • Get interval data so that you can see daytime surplus and evening demand.
  • Size the array to the roof or land and the export condition.
  • Size the battery to the energy you want to shift (kWh) and the power you need (kW). See How a BESS is designed and sized.
  • Check charging hours: the battery needs enough solar or off-peak hours to refill every day.
  • Check the site: space, plinth, cable routes, ambient temperature, internet connectivity.

Common mistakes to avoid

  • Sizing the battery without interval data
  • Ignoring neutral-to-earth voltage, harmonics or surge protection at the site
  • Leaving out internet connectivity, which manufacturers use for monitoring and, in some cases, warranty terms
  • Letting uncertified teams commission the system, which can affect the warranty
  • Promising a fixed saving instead of a calculation with stated assumptions

What EPC companies should expect from a BESS supplier

The hardware is only part of the offer. A supplier worth partnering with provides:

  • Sizing and single-line diagram support for each project
  • Commissioning or supervised commissioning
  • Installer training and certification, because manufacturers such as TCL tie warranty to certified or authorised installers
  • India spares stock and fast response on faults
  • Warranty registration and claim handling with the manufacturer
  • Remote diagnostics from system data

This is the model Nexera Powertech follows as an authorised partner of TCL and Hithium. You sell and install to your customer; Nexera supports the equipment, design and service behind it.

Talk to Nexera

If you are a solar EPC company or installer, become a Nexera partner and get sizing support, training and India spares for your next solar-plus-storage project. End customers can request a site assessment.

Frequently asked questions

Can I add a battery to a solar plant I already installed?

Usually yes, with an AC-coupled battery. The design depends on the inverter, the point of connection and the DISCOM's rules.

What is zero-export solar?

A solar plant configured so that no power flows back to the grid. Any surplus must be consumed on site or stored in a battery.

Does a solar inverter work during a power cut?

A standard grid-tied inverter shuts down when the grid fails, for safety. A hybrid or battery system with backup capability can keep loads running.

How can an EPC company become a Nexera partner or distributor?

Contact Nexera through the partner page. We onboard EPC partners with product training, sizing support and certification.

Which brands does Nexera offer for EPC projects?

Nexera supplies TCL and Hithium battery storage, from C&I cabinets to utility-scale blocks.

Do I need approvals for adding storage?

Yes, requirements vary by DISCOM and state. Nexera's team can help you prepare the technical documents.

PartnerDeployAccelerate

Let’s Build India’s Energy Storage Future Together

Whether you’re a solar EPC looking to partner, or an end customer exploring a solution, Nexera is your trusted partner for BESS.